Reconstruction of the bridge over the Psel River

Reconstruction of the bridge over the Psel River near the town of Hadyach, km 50+840 of the highway

State significance t-17-05 Lokhvytsia – Hadyach – Okhtyrka – checkpoint “Velyka Pisarivka”,

Poltava region

Bridge at km 50+840

The project provides for the construction of a bridge according to the temperature-continuous design scheme 2×16.76+3×16.76+3×16.76+3×16.76+2×16.76 m. The length of the bridge is 219.18 m. The bridge is located on a straight section in plan. The position of the middle (transverse axis) of the bridge is preserved in relation to the existing one and is km 50+840.

The total width of the bridge is 12.9 m, which includes two lanes of 3.5 m and two sidewalks of 1.25 m. The bridge dimensions are G-9.0+2*1.25 m, which corresponds to the dimensions of a bridge for a road of the III technical category.

Temporary vertical loads on the structure are adopted in accordance with DBN V.1.2-15:2009 and are:

–        A15 in combination with a crowd on the sidewalks;

–        NK-100.