The construction object is “New construction of Dona Aminado Street in Kropyvnytskyi (Stage 1 of the construction object)”.
The design was carried out at the stage – Project. According to the approved feasibility study, the construction of the street is planned in two stages. The project presents the Stage 1 of construction.
The construction site is located at PK 0+00.0 – PK 4+40.0. The length is 440 m.
A 2×1.5 m overflow pipe and a bridge across the Ingul River are planned to be installed on this site. The bridge has a total length of 193.70 m.
The beginning of the project site is located at PK 0+00.0 and adjoins Bobrynetskyi Shlyakh street.
The end of the project site is located at PK 4+40.0.
After construction work, the street will have the following characteristics:
- number of traffic lanes – 2 lanes;
- width of the traffic lane – 3.00 m;
- width of the carriageway – 6.0 m;
- width of the safety strip – 2 x 0.50 m;
- width of the sidewalk – 2.25 m;
- width of the bicycle path with two-way traffic – 3.0 m;
- estimated speed – 60 km/h;
- minimum radius of the curve in the plan – 125 m;
Main technical indicators of the longitudinal profile:
- the largest longitudinal slope – 41‰;
- the smallest radius of vertical curves:
convex – 2500 m;
concave – 600 m.
To drain water from the carriageway, the project provides for the installation of a storm sewer and two treatment facilities. To pass water under the road, at the beginning of the project section, it is planned to install a culvert d = 2×1.5m.
The project provides for the construction of a new bridge with the following main parameters:
- prefabricated monolithic temperature-continuous span structure according to the scheme 4×24.0 + 4×24.0 m;
- intermediate supports – reinforced concrete columnar on a pile foundation;
- end supports – pile single-row poured reinforced concrete;
- total bridge length – 193.7 m;
- bridge structures are designed for the following loads: self-weight of structures, soil pressure of the embankment, temporary from rolling stock – A15 and NK-100, temporary from pedestrians (as a vertically evenly distributed 0.4 t / m2), wind, temperature and climatic.