Major repairs to a bridge on a highway

Overhaul of the bridge on the local public road O100720 Vasylkiv-Kniazhychi-Luka-Horenychi-/M-06/ km 20+119

Bridge over the Irpin River

The detailed design provides for the construction of a new bridge span structure, intermediate supports and repair of the concrete surfaces of the extreme supports.

The main parameters of the bridge after overhaul:

  • continuous prefabricated monolithic span structure according to the scheme 11.65+2×18.0+2×11.675+18.0+11.65 m;
  • intermediate supports – permanent grillage on a two-row pile foundation made of monolithic reinforced concrete;
  • total length of the bridge – 103.59 m;
  • the bridge structures are designed for the following loads: self-weight of the structures, temporary loads from rolling stock – A11 and NK-80, temporary loads from pedestrians (as a vertically evenly distributed 0.4 t/m2), wind, temperature and climatic loads.